Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of a master plan through the park design process and phase 1 development.Bayshore Live Oak Park - West Fishing Pier
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Sheriff Administration and Hardened 911 Facility
Last Updated: 03/01/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Supervisor of Elections Warehouse
Last Updated: 03/01/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Rampart Blvd. Sidewalk phase 2
Last Updated: 02/29/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Rampart Blvd. Sidewalk phase 2Rampart Blvd. Sidewalk phase 3
Last Updated: 02/29/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Rampart Blvd. Sidewalk phase 3Sunset Boulevard East Sidewalk
Last Updated: 02/29/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Sunset Boulevard East SidewalkLast Updated: 02/29/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Marathon Boulevard Pathway